Planning
Proper planning is the be-all and end-all.
WU planning
The construction of a white tank in accordance with the DAfStb waterproofing guideline requires a detailed description of all sealing-related services.
Based on the client’s specifications and the local conditions as well as the information from the work planning, structural analysis and geological report, we create a detailed sealing plan.
Each of our WU plans contains:
- Documentation on the design water level, load and utilization class and design principle
- List of responsibilities of all parties involved
- Checklist for documenting the implementation of all plan specifications
- Joint planning incl. . Detailed drawings and assembly instructions


FBV planning
There is currently no generally applicable guideline for the design of FBV waterproofing membranes. The DBV code of practice “Fresh concrete composite systems” is currently the recognized guideline for the use of FBV systems.
We implement the recommendations for planning described in the DBV code of practice in a practical manner.
WU / FBV combined planning
Planning the installation of the FBV system is always based on professional waterproofing planning. Since a large number of implementation details of a WU planning only need to be supplemented to create an FBV planning, the holistic planning of both types of construction is ideal.
Our WU/FBV plans are the instructions for creating a watertight structure and, if our specifications are implemented professionally, guarantee the long-term serviceability of the structure in terms of its watertightness.

You might also be interested in
Joint sealing
System description
Surface sealing
System description
Sealing incl. Insulation
System description
Are you planning a building and need support with waterproofing?
Then get in touch. We are happy to support you.